Flexi Versa Group
Capabilities
Industries
About UsGlobal PartnershipsNews & InsightsCareers
Contact Us
Capabilities
No links available
Industries
No links available
About Us
Global Partnerships
News & Insights
Careers
Contact Us

Nothing here yet, please check back soon.

arrow
No links available
Flex Versa Group

Capabilities
    Industries
      • About Us
      • Global Partnerships
      • News & Insights
      • Careers
      • Contact Us

      © 2026. Flexi Versa Group. All Rights Reserved.

      Privacy Policy
      |
      Terms & Conditions
      case studies

      Full Box Build Experience

      Close-up of a green circuit board with various electronic components on a production line, featuring a central processing chip.

      The Challenge

      A global consumer electronics leader required a fast and cost-effective route to market for a new audio product. Traditional OEM models demanded managing multiple suppliers across the value chain, leading to long lead times, complex coordination, and increased cost pressures. The customer needed a partner who could simplify this process without compromising on product quality or performance.

      The Solution

      FVG delivered a complete box build solution, consolidating electronics, acoustics, and finishing into a single integrated process. This streamlined approach reduced supplier dependency and accelerated development cycles.

      Manufacturing Process:

      • Electronics Integration: Complete PCB assembly and seamless integration within the product build.

      • Acoustic Engineering: Precision-built speaker drivers, enclosures, and sealing elements for consistent sound performance.

      • Full Box Build: Moulded parts, coatings, and labelling combined into a fully assembled, market-ready unit.


      By consolidating electronics, acoustics, and finishing into a single integrated process, front-loading Make/Buy decisions, running product and manufacturing ideation in parallel, and applying VAVE (Value Analysis / Value Engineering), FVG shortened lead times while maintaining quality and optimising cost.



      Close-up of modern soundbar and

      The Outcome

      With vertical integration and a streamlined Build to Order approach, FVG delivered beta units within six months from tool-up. Manufacturing cost was contained at 15 percent of RRP, which is half the typical OEM benchmark.

      Final production turnaround was reduced to only four weeks, showcasing the strength of FVG’s full box build capability and delivering a faster, more cost-efficient route to market for the customer.

      Contact us to find out more.